SEP 1998 – 3 JUL 2001

 

Selected Refit Pix

 

(I have about 3000 more of these if there is something you wish to see . . .)

 

Use the “BACK” arrow to access previous page from here or from photos.

 

THE WORK BEGINS.jpg  STRIPPING OLD GEAR.jpg  OLD ELECTRICAL PANEL.jpg  STRIP DECK & CABINTOP.jpg  NEW DECK LUMBER.jpg  LAYING OUT THE DECK.jpg  FITTING THE DECK.jpg  EPOXYING THE DECK.jpg  DESIGNING NEW CARBON-FIBRE  RAIL SYSYEM.jpg  LAYING UP THE CARBON-FIBRE RAILS.jpg  NEW PAINT.jpg  new water tank installed.jpg  ENERGY GENERATION SYSTEM.jpg  ENERGY STORAGE & CONTROL.jpg  NEW MOORING ANCHOR.jpg  INTERIOR REFINISHED.jpg  NEW HULL PAINT & GRAPHICS.jpg  NEW ELECTRICAL PANEL.jpg  NAV STATION.jpg 

 

http://www.ciekurzis.org